📜 A modern movable weir and small hydroelectric power plant on the Berounka river, built in 2010-2011.
🔍 It plays a key role in flood protection, renewable energy generation, and features a 130-meter-long natural fish pass.
🏗️ Witness impressive modern engineering and infrastructure
💧 See how water levels are regulated and energy is produced
🐟 Observe the 130-meter-long natural fish pass
🏞️ Enjoy views of the Berounka river and surrounding area
📏 The weir is 2.5 meters high and 90 meters wide, composed of three separate fields.
⚡ The small hydroelectric plant uses four Kaplan turbines, generating 720 kW.
🗓️ Replaced an older weir first depicted in 1602.
Located at 266 01 Beroun, accessible from the surrounding area for viewing.