📜 Cable-stayed bridge connecting the southeastern Croatian semi-exclave to the rest of the country, bypassing Bosnia and Herzegovina's coastal strip.
🔍 Designed by Slovenian engineer Marjan Pipenbaher, opened in 2022.
🌉 Provides an uninterrupted link through Croatian territory, avoiding multiple border checks
🏞️ Offers scenic views and a beautiful backdrop
📐 An impressive engineering feat, featuring 13 spans and 7 cable-stayed sections
🚗 Significantly shortens travel time to Pelješac, bypassing long queues
💸 Considered a very expensive solution, especially if Bosnia joins the EU soon
🗣️ Was historically a politically controversial project
📍 Located in Dubrovnik-Neretva County, Croatia
💰 Construction cost was €420.3 million; no toll for vehicles.
Last updated 1 day ago
We strive for accuracy, but errors may occur. Please verify key info.