📜 A significant functionalist water management complex on the Elbe River, built between 1930 and 1936.
⚙️ Features a movable weir, a navigation lock, and a hydroelectric power plant, designed by Kamil Roškot.
✨ Discover a key piece of industrial architecture and a vital part of the Elbe waterway.
💡 See a hydroelectric power plant with two Kaplan turbines (1.98 MW output), reconstructed in 2017.
🐠 Observe the 19-meter-long chambered fish pass, 1.2 meters wide.
🛶 Check out the artificial slalom course, 330 meters long, built in 1979 on the mill race outflow channel.
📏 Learn about the weir's three 23-meter-wide fields with a 4.2-meter damming height.
🚢 Note the single-chamber navigation lock, 85 meters long and 12 meters wide.
⚠️ Public access to the weir's service bridge ended in March 2013, and access to the weir is generally restricted.
🏛️ Operated by Povodí Labe, with the hydroelectric power plant managed by ENERGO-PRO Czech s.r.o.